Quantcast
Viewing all articles
Browse latest Browse all 5432

Residual Inventory at Subcontractors from Partial Receipts

In R3P, our current receiving process for subcontracted materials back flushes the corresponding BOM quantity for a child material based on the quantity of the parent material being received. The residual inventory remains in subcontracting stock at the vendor.

 

 

EXAMPLE 1 (Current State):

 

     Subcontracting PO:                            Receipt in MIGO:               Residual Inventory at subcontractor:

     Parent Material = 300                         Parent = 299              

               Child Material (a) = 600               Child (a) = 598               Child (a) = 2

               Child Material (b) = 300               Child (b) = 299               Child (b) = 1

         

 

Occasionally we need all of the child material to back flush from the subcontracting inventory, regardless of the parent quantity (Labels are an excellent example):

 

 

EXAMPLE 2 (Desired Outcome):Image may be NSFW.
Clik here to view.


     Subcontracting PO:                              Receipt in MIGO                 Residual inventory at subcontractor:

 

          Parent = 300                                    Parent = 299 

               Child (a) = 600                                  Child (a) = 600               Child (a) = 0

               Child (b) = 300                                  Child (b) = 300               Child (b) = 0

 

 

Currently I have to manually adjust the BOM quantity before entering the receipt or adjust the inventory via cycle count.  This is time consuming and does not seem to be the "proper" way of handling this type of transaction. 

 

What can we do during the receiving process to get the result as illustrated in EXAMPLE 2 above?

 

Thanks in advance for your feedback!


Viewing all articles
Browse latest Browse all 5432

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>