Quantcast
Viewing all articles
Browse latest Browse all 5432

CRM Java Upgrade 6.0 to 7.02 MOPZ Issue NW target is current 7.00 SP21

Hi All,

 

I performed dual Stack Split in CRM 6.0 in preparation for CRM upgrade to 7.02. After split with separate DB for ABAP and JAva, I tried to generate XML for upgrade. MOPZ is showing target for ABAP CRM perfectly 7.02/NW7.03. On the Java side, Target is showing as 7.02/NW 7.00 SP21 which is current NW level. Please advise what could be wrong and how to fix and generate XML with correct Target. SLD is pulling all Java side components correctly after SLD reconfigure.

 

Thanks,

Kavitha Rajan.


Viewing all articles
Browse latest Browse all 5432

Trending Articles