Hi All,
we have implemented standard urgent change,when we are trying to move the TR from quality to production the status is set in production and under the landscape i can see the TR is imported,but the TR is not moved in to to production system.
When i checked the application log & task list i could see that the TR is imported with error.(the TMW rfc is working fine,no connection issues & auth issues observed.)
The task list has the below error message:
Message Text
Error RFC destination SM_XXXCLNT100_TMW: Error when opening an RFC connection (CPIC-CALL: ' ThSAPOCMINIT' : cmRc=26 thRc=631
Maximum
Technical Data
Message type__________ | E (Error) |
Message class_________ | /TMWFLOW/TRACK_N (Message Class for Tracking) |
Message number________ | 106 |
Message variable 1____ | SM_XXXCLNT100_TMW |
Message variable 2____ | Error when opening an RFC connection (CPIC-CALL: ' |
Message variable 3____ |
ThSAPOCMINIT' : cmRc=26 thRc=631Maximum number of
Message variable 4____ |
Message Attributes
Level of detail_______ | |
Problem class_________ | |
Sort criterion________ | |
Number________________ |
*********************************************************************
any idea what is this error?
Thanks,
Kittu