I am trying to implement Solution manager 7.1 SP8 patches to SPS 13 using SUM 1.0 SP 13 patch 4.
SUM looks stuck in phase PREP_IMPORT/TOOLIMPD from almost 5 hours.
Is it usually take that long to pass this phase?
There is no activity on log file from almost 3 hours. The only log file updated recently is <sum directory>/abap/tmp/dev_evt: below are the the lines i se in there:
Wed Jul 29 14:58:29 2015
Trace File of External Event Raiser (Level=0, Append=0)
******* Complete Call: *******
E:\usr\sap\<SID>\DVEBMGS00\exe\sapevt.exe
SAP_TRIGGER_RDDIMPDP
name=<SID>
nr=00
pf=\\<host name>\sapmnt\<SID>\SYS\profile\DEFAULT.PFL
******* End of Call *******
EventID: SAP_TRIGGER_RDDIMPDP
SAP message server host: <host name>
SAP message server service (new): 3901
SAP message server service (old): sapms<SID>
Event sent to server <host name>_<SID>_00
Should i wait? how long i should wait?
i don't see any error though?
Thanks
Mani