test sequence

i've created a test package with 8 test cases within it and I assigned a sequence ID to these 8 test cases from 1 to 8, test case with sequence 1 is ready to test but i am able to start testing from sequence 2 or 3

i want to know what else i should do that system not letting user start testing from higher sequence while the sequence 1 is not completed?